Reference

Diaverum Kidney Centre Hamburg Wandsbek

"For our new kidney centre in Hamburg-Wandsbek, it was important to us to combine modern patient care with the responsible use of resources. GreenTec Dialysis supported us in this with a high level of technical expertise and proved to be a reliable and solution-oriented partner throughout the entire project. This enabled us to successfully complete the centre as planned." Klaus Beyersdorf, Area Manager Region North, Diaverum Deutschland GmbH

Share post

Implementation: 2025/2026
Solutions in use: HE.RO with heat pump, GreenTec Performance System (GPS) Smart Water, Smart Energy, PV-sytem planned

Description of the project:

The new Diaverum Kidney Centre Hamburg Wandsbek combines the former Hamburg sites Alter Teichweg and Wandsbek, creating one of the largest and most modern dialysis centres in Germany. The new centre offerst patients and staff improved facilities and technical infrastructure.

Objective:

As part of its new-build project, Diaverum Germany was looking for a partner to develop a comprehensive and future-proof concept for its dialysis technology. Particular emphasis was placed on a sustainable design.

Our concept enables Diaverum to provide dialysis care of the highest standard. At the same time, at its largest centre in Germany, the operator can save on energy and water compared with conventional set-ups, thereby optimising operating costs.

Our Services as GreenTec Dialysis GmbH:

Following the specialist planning for medical technology and the development of the GreenTec sustainability concept, including the application for public funding, we were commissioned to implement the project.

We implemented our Smart Dialysis® concept, consisting of Cross-sector Integration, including our HE.RO heat recovery systems combined with heat pumps, as well as our GPS monitoring software.

The installation included two dual-stage DWA reverse osmosis systems with hygienic hot-water disinfection, two concentrate mixing systems from B. Braun, and a custom-designed media supply rail with the corresponding distribution systems.

Our in-house developed CPG (Chlorine Protection Guard) continuously monitors chlorine levels in drinking water in accordance with DIN EN ISO 23500. The device removes chlorine using activated carbon filtration and triggers an alarm if chlorine concentrations exceed the defined threshold. Chlorine can damage reverse osmosis membranes and may potentially reach the patients. This poses a risk to patients and must therefore be prevented.

With Smart Dialysis®, we work together with our customers to move closer to the goal of greener dialysis.

 

Benefits

  • Savings in electricity consumption and CO₂ emissions through pre-heating of drinking water using thermal energy from the heat pump cascade
  • Relief for staff through digitalisation of documentation tasks (e.g. daily protocol)
  • Reduction of service costs through digitalisation of the water treatment system (remote monitoring)

About our client:

The centre opened in 2026 and offers 92 dialysis stations, making it one of the largest kidney centres in Germany.
https://www.diaverum.de/de/clinic-container/diaverum-nierenzentrum-hamburg-wandsbek/

Further references

Foto vom Gebäude des Dialysezentrums Bad Kissingen, Ansicht aus Vogelperspektive
Reference

Kidney Centre Bad Kissingen – B.Braun via medis

"By combining our proven B. Braun dialysis technology with the innovative technology from GreenTec Dialysis, we deliver a sustainable care service for people with kidney disease that also optimises operating resources. GreenTec Dialysis is a key part… ...

Scroll to top
We are a member and support Startup Verband e.V. DGAHD e.V. Industriekuratorium Deutsche Gesellschaft für Neprologie ZUKE GREEN leaders for climate action nafasi BNW Bundesverbend Nachhaltige Wirtschaft e.V.