Description of the project
Our client wanted to extend an existing dialysis centre by 15 treatment stations. Working closely with the client, architects and construction managers, we developed a concept that combines ecological and economic aspects in dialysis.
Our services as GreenTec Dialysis GmbH:
As the general contractor, we first carried out a needs analysis across various areas (nursing, medical, technical) and a product-neutral market analysis. As part of the specialist planning, we also submitted a building application, including an adapted fire protection plan.
We implemented our Smart Dialysis concept, consisting of Cross-Sector Integration, here with our HE.RO in combination with a heat pump and a PV system (48 kWp), as well as our GPS (GreenTec Performance System) as monitoring software. In addition, we installed a single-stage Nipro reverse osmosis system combined with a hygienic hot cleaning system. The existing loop (permeate and concentrate) was extended with a customised special solution.
The Combination of Cross-Sector Integration and our GPS is what we call “Smart Dialysis®“. Smart dialysis® enables our customers to save costs while consuming less energy and water.
This is how we as an industry are getting closer to the goal of green dialysis.