Braunschweig Municipal Hospital
As part of the construction of the new clinic dialysis unit, we were awarded the contract to design and implement our Smart Dialysis solution. ...
Our Smart Dialysis concept for optimising operating costs and reducing CO₂ emissions.
Implementation: 2024
Solutions in use: HE.RO with heat pump, GreenTec Performance System (GPS) Smart Water/Smart Energy
Currently in planning: PV
Objective: Optimise operating costs, reduce CO2 emissions, and increase operational safety by monitoring consumption data with our GreenTec Performance System (GPS)
Our services as GreenTec Dialysis GmbH:
Following a potential analysis and the subsequent specialist planning, including the application for public funding, we carried out the project as general contractor.
We implemented our Smart Dialysis concept. In this case it consists of our Cross-sector Integration with PV and our HE.RO in combination with a heat pump, as well as our GPS as control and monitoring software.
We complemented the package with 2 x 1500 l buffer storage tanks to store excess solar energy during dialysis-free periods (e.g. Sundays).
We integrated our systems with the existing water technology.
We call the combination of Cross-sector Integration and our GPS “Smart Dialysis®“. Smart dialysis® enables our customers to save costs while consuming less energy and water.
This is how we are getting closer to the goal of green dialysis.
The Kidney Centre “Nierenzentrum Ammerland” is owner-managed and based in Westerstede.
1KOMMA5°
1komma5.com
As part of the construction of the new clinic dialysis unit, we were awarded the contract to design and implement our Smart Dialysis solution. ...
"By combining our proven B. Braun dialysis technology with the innovative technology from GreenTec Dialysis, we deliver a sustainable care service for people with kidney disease that also optimises operating resources. GreenTec Dialysis is a key part… ...